Electricity: Silver
Price book and matching contract pad for the Silver electricity product.
Pricing Documents / Electricity / Silver
Documents
Silver price book contracts must be submitted using the Silver matching contract pad.
Pricing guidelines
Read before quoting
- Profile classes 03 and 04 (NHH) only
- Minimum EAC 1,000 kWh, maximum EAC 300,000 kWh
- Both standard and green products are offered
- Price each meter on its correct rate structure and LLF banding. Meters quoted on the wrong rate structure or LLF banding will be rejected and must be repriced
- Prices apply to the contract start dates shown in the current file
- For multisite quotes of more than 5 sites, request these at tenders@dyce-energy.co.uk. They will be priced from the matrix prices
- A signed Direct Debit mandate is required with every contract
- Maximum uplift is 3p/kWh