Electricity: Silver

Price book and matching contract pad for the Silver electricity product.

Pricing Documents / Electricity / Silver

Documents

Silver price book contracts must be submitted using the Silver matching contract pad.

Pricing guidelines

Read before quoting
  • Profile classes 03 and 04 (NHH) only
  • Minimum EAC 1,000 kWh, maximum EAC 300,000 kWh
  • Both standard and green products are offered
  • Price each meter on its correct rate structure and LLF banding. Meters quoted on the wrong rate structure or LLF banding will be rejected and must be repriced
  • Prices apply to the contract start dates shown in the current file
  • For multisite quotes of more than 5 sites, request these at tenders@dyce-energy.co.uk. They will be priced from the matrix prices
  • A signed Direct Debit mandate is required with every contract
  • Maximum uplift is 3p/kWh

Price books can be withdrawn at any time

Prices exclude CCL and VAT

Prices are subject to the installation of a smart meter, if the meter is eligible. Where installation is refused we reserve the right to amend contract prices to our smart default rate.